GENERAL DECISION: MI20080005 01/01/2010 MI5 

Date: January 1, 2010
General Decision Number: MI20080005 01/01/2010

Superseded General Decision Number: MI20070005

State: Michigan

Construction Types: Building and Heavy

Counties: Bay, Genesee, Lapeer, Saginaw, St Clair and Tuscola 
Counties in Michigan.

BUILDING CONSTRUCTION PROJECTS (does not include residential
construction consisting of single family homes and apartments
up to and including 4 stories); HEAVY CONSTRUCTION PROJECTS
(does not include airport or bridge construction projects, or
sewer or water line work if it is incidental to a highway
construction project)

Modification Number     Publication Date
           0              02/08/2008
           1              02/15/2008
           2              03/07/2008
           3              03/21/2008
           4              04/04/2008
           5              05/02/2008
           6              06/06/2008
           7              06/13/2008
           8              06/20/2008
           9              07/11/2008
          10             07/18/2008
          11             07/25/2008
          12             08/08/2008
          13             08/15/2008
          14             08/22/2008
          15             09/05/2008
          16             10/17/2008
          17             10/31/2008
          18             11/07/2008
          19             11/28/2008
          20             12/05/2008
          21             12/12/2008
          22             12/26/2008
          23             01/16/2009
          24             01/23/2009
          25             02/20/2009
          26             03/06/2009
          27             04/03/2009
          28             05/01/2009
          29             06/12/2009
          30             07/03/2009
          31             07/24/2009
          32             08/14/2009
          33             08/28/2009
          34             09/25/2009
          35             10/16/2009
          36             11/06/2009
          37             11/13/2009
          38             12/04/2009
          39             12/18/2009
          40             01/01/2010

 ASBE0025-002 06/01/2009

ST. CLAIR COUNTY:

                                   Rates          Fringes

ASBESTOS WORKER/INSULATOR  
     Includes the application 
     of all  insulating 
     materials, protective  
     coverings, coatings, and 
     finishings to all types of 
     mechanical systems..........$ 30.77            22.28

  FOOTNOTE: Work requiring a spray coating in the application:
  Five percent (5%) per hour additional.
----------------------------------------------------------------
 ASBE0047-010 07/01/2009

                                   Rates          Fringes

ASBESTOS WORKER/INSULATOR  
     Includes the application 
     of all insulating 
     materials, protective 
     coverings, coatings and 
     finishings to all types of 
     mechanical systems..........$ 28.42            15.41
----------------------------------------------------------------
 BOIL0169-004 07/01/2008

                                   Rates          Fringes

BOILERMAKER......................$ 31.953          20.869
----------------------------------------------------------------
 BRMI0007-001 08/01/2008

BAY, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

Marble, terrazzo and tile   
finisher.........................$ 16.72             6.93
Marble, terrazzo and tile   
setter...........................$ 21.94             9.75
----------------------------------------------------------------
 BRMI0009-012 08/01/2008

                                   Rates          Fringes

Bricklayer, Caulker, Cleaner,   
Pointer..........................$ 27.58            14.07
Cement Mason and plasterer.......$ 23.32             9.65
CEMENT MASON/CONCRETE FINISHER...$ 22.72             9.15
FINISHER.........................$ 19.13             8.37
PLASTERER........................$ 23.98             8.94
Tile, Marble & Terrazzo Worker...$ 22.00            11.54

FOOTNOTE:   

  Paid Holiday: Fourth of July, if the worker was employed by
  the contractor in any period of seven working days before
  said holiday within the current calendar year.
----------------------------------------------------------------
 BRMI0009-014 08/01/2008

LAPEER COUNTY:

                                   Rates          Fringes

Bricklayer, Caulker, Cleaner,   
Pointer & Stonemason.............$ 29.95            14.26
Cement Mason and plasterer.......$ 26.69            12.24
FINISHER.........................$ 22.43             9.80
Tile, Marble & Terrazzo Worker...$ 26.49            11.77

FOOTNOTE:   

  Paid Holiday: Fourth of July, if the worker was employed by
  the contractor in any period of seven working days before
  said holiday within the current calendar year.
----------------------------------------------------------------
 BRMI0010-002 06/01/2009

ST. CLAIR COUNTY:

                                   Rates          Fringes

BRICKLAYER  
      Bricklayer.................$ 34.05            15.33
      Cement mason...............$ 29.96            11.89
      Plasterer..................$ 30.14            13.30

FOOTNOTES:

  Paid Holiday:  Fourth of July, if the worker was employed by
  the contractor in any period of seven working days before
  said holiday within the current calendar year.
----------------------------------------------------------------
 BRMI0010-004 08/01/2008

BAY, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

BRICKLAYER.......................$ 25.56            12.97
CEMENT MASON/CONCRETE FINISHER...$ 23.83            11.94
FINISHER.........................$ 16.72             6.93
PLASTERER........................$ 24.76            13.02
Tile, Marble & Terrazzo Worker...$ 21.94             9.75

FOOTNOTE:   

  Paid Holiday: Fourth of July, if the worker is employed by
  the contractor in any period of seven working days before
  said holiday within the current calendar year.
----------------------------------------------------------------
 BRMI0032-002 06/01/2009

ST. CLAIR COUNTY:

                                   Rates          Fringes

MARBLE FINISHER..................$ 24.86            16.51
MARBLE MASON.....................$ 31.34            16.51
TERRAZZO FINISHER................$ 25.33            16.51
TERRAZZO WORKER/SETTER...........$ 30.80            16.51
TILE FINISHER....................$ 24.88            16.51
TILE SETTER......................$ 30.75            16.51

  FOOTNOTES: Work on scaffolding over 15 ft.: $1.25 per hour
  additional.Swing stage work: $1.50 per hour
  additional.Terrazzo grinding: $0.50 per hour above the
  terrazzo finisher rate.   Terrazzo work grinding vertical
  work and stairs: $1.50 per hour above the terrazzo finisher
  rate.
----------------------------------------------------------------
 CARP0687-002 06/01/2007

ST. CLAIR COUNTY:

                                   Rates          Fringes

CARPENTER (Drywall Hanger).......$ 26.88            15.27
Diver............................$ 33.19            17.95
Pile Driver......................$ 26.597    25.08%+8.916

FOOTNOTES:   

  Piledrivers: Loftsperson or sticker:$0.55 per hour
  additional. Loftsperson or sticker on heights over 150
  feet: $0.80 per hour additional. Welder: $0.55 per hour
  additional.
----------------------------------------------------------------
 CARP0706-001 06/01/2008

                                   Rates          Fringes

CARPENTER  
     (Including drywall hangers).$ 25.64            12.87
----------------------------------------------------------------
 CARP0706-002 06/01/2008

BAY, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

CARPENTER  
     (Including drywall hangers).$ 25.08            12.83
----------------------------------------------------------------
 CARP1045-002 06/01/2008

ST. CLAIR COUNTY:

                                   Rates          Fringes

LATHER...........................$ 23.69            13.52
----------------------------------------------------------------
 CARP1045-006 06/01/2008

GENESEE AND ST. CLAIR COUNTIES:

                                   Rates          Fringes

FLOOR LAYER:  CARPET (SOFT)   
FLOOR............................$ 29.10           14.117
----------------------------------------------------------------
 CARP1045-017 07/17/2008

BAY, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

LATHER...........................$ 24.29            13.66
----------------------------------------------------------------
 CARP1045-018 07/17/2008

GENESEE AND LAPEER COUNTIES:

                                   Rates          Fringes

LATHER...........................$ 24.85            13.70
----------------------------------------------------------------
 ELEC0017-002 06/02/2008

LAPEER, ST. CLAIR AND TUSCOLA COUNTIES:

                                   Rates          Fringes

Line Construction  
     Cable splicer; Line 
     technician when helio-arc 
     welding.....................$ 39.03         4.80+26%
     Combination 
     driver/groundman............$ 26.05         4.80+26%
     Combination equipment 
     operator and groundman......$ 27.61         4.80+26%
     Groundman...................$ 23.99         4.80+26%
     lineman.....................$ 37.47         4.80+26%
TECHNICIAN  
     (all commercial work 
     except line construction)...$ 33.85         4.80+26%
----------------------------------------------------------------
 ELEC0058-001 03/01/2006

ST. CLAIR COUNTY:

                                   Rates          Fringes

ELECTRICIAN  
     Work on sound and 
     communications/limited-
     energy systems (including 
     inter-communication public 
     address, paging, music, 
     security systems, nurse 
     call systems, 
     telecommunications (voice 
     and data), fiber optic 
     cabling systems, sound 
     systems, broadband 
     systems, computer network 
     systems, CCTV systems, 
     fire detection/signaling 
     systems, and temperature 
     control systems)............$ 27.83       3% +  6.25
     All other work..............$ 33.00        3% +14.16
----------------------------------------------------------------
 ELEC0557-001 06/01/2009

AGINAW COUNTY; TUSCOLA COUNTY (Townships of Almer, Arbela,
Columbia, Dayton, Denmark, Elkland, Ellington, Elmwood,
Fairgrove, Fremont, Gilford, Indianfields, Juniata, Kingston,
Koylon, Novesta, Tuscola, Vassar, Watertown and Wells):

                                   Rates          Fringes

ELECTRICIAN......................$ 31.13            15.52

  FOOTNOTE: High work: Electrical work thirty-five feet (35')
  (to the work) above the ground or permanent floor, where a
  hazard exists:15% per hour additional.
----------------------------------------------------------------
 ELEC0692-002 06/01/2009

BAY COUNTY AND TUSCOLA COUNTY (Townships of Akron and Wisner):

                                   Rates          Fringes

ELECTRICIAN......................$ 29.46      7.20+26.33%
----------------------------------------------------------------
 ELEC0876-002 06/02/2008

BAY, GENESEE AND SAGINAW COUNTIES:

                                   Rates          Fringes

LINE CONSTRUCTION  
     Cable splicer...............$ 33.85      4.75+23.75%
     Light equipment 
     operator/ground 
     person/truck driver/ground 
     person (winch, A-frame, 
     diggers when used for 
     distribution line truck 
     and used for distribution 
     work. Distribution truck 
     driver, 5th wheel type 
     trucks, bucket  trucks, 
     ladder trucks and all live 
     boom trucks, all equipment 
     85 hp or under).............$ 21.42      4.75+23.75%
     Line technician.............$ 32.51      4.75+23.75%
     Operator/groundman 
     (digger, tractor and 
     setting rig with tracks or 
     rough terrain vehicle, 
     large bombardier, backhoe 
     over 85 hp, hydraulic 
     crane 10 ton or over).......$ 24.45      4.75+23.75%
     Truck driver/groundman 
     (trucks with winch or boom 
     or dump, other than 
     distribution work)..........$ 20.39      4.75+23.75%

  FOOTNOTE: Operators of 5/8 yd. rated capacity backhoe or
  over, and operators of 25 ton, rated capacity, crane or
  over, and operators of heavy duty tension or pulling
  machinery on 345 KV and above, shall receive the line
  technician rate of pay.
----------------------------------------------------------------
 ELEC0948-001 06/04/2007

GENESEE AND LAPEER COUNTIES; TUSCOLA COUNTY (Township of
Millington):

                                   Rates          Fringes

ELECTRICIAN......................$ 34.89         6.60+22%
Sound & Communication   
Technician.......................$ 22.10       6.60+15.5%

  FOOTNOTES: Work on towers or stacks: double the straight time
  rate of pay. Work in other hazardous locations located 40
  or more feet from the floor or ground to the work: 10% per
  hour additional. Work under compressed air in tunnels or
  shafts below the ground level: 15% per hour additional.
  Work in an area where injurious gases or fumes are present
  and when instructed to wear gas masks: 15% per hour
  additional while working in that area and being required to
  wear gas masks.
----------------------------------------------------------------
* ELEV0036-002 01/01/2010

ST. CLAIR COUNTY:

                                   Rates          Fringes

ELEVATOR MECHANIC................$ 42.45           20.035

  FOOTNOTE: Vacation Pay: 8% with 5 or more years of service,
  6% for 6 months to 5 years service. Paid Holidays: New
  Years Day,  Memorial Day, Independence Day, Labor Day,
  Veterans Day, Thanksgiving Day and  Friday after, and
  Christmas Day.
----------------------------------------------------------------
* ELEV0085-002 01/01/2010

BAY, GENESEE, LAPEER, SAGINAW, AND TUSCOLA COUNTIES:

                                   Rates          Fringes

ELEVATOR MECHANIC................$ 42.73           20.035

  FOOTNOTE: Vacation Pay: 8% with 5 or more years of service,
  6% for 6 months to 5 years service. Paid Holidays: New
  Years Day,  Memorial Day, Independence Day, Labor Day,
  Veterans Day, Thanksgiving Day and  Friday after, and
  Christmas Day.
----------------------------------------------------------------
 ENGI0324-008 10/01/2009

ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,
BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KEWEENAW, LAKE, LAPEER,  LEELANAU, LENAWEE, LIVINGSTON, LUCE,
MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,
MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,
MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,
OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.
CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,
VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES

                                   Rates          Fringes

POWER EQUIPMENT OPERATOR   
(Sewer Relining)  
     GROUP 1.....................$ 28.65            11.64
     GROUP 2.....................$ 27.12            11.64

SEWER RELINING CLASSIFICATIONS

  GROUP 1: Operation of audio-visual closed circuit TV system,
  including remote in-ground cutter and other equipment used
  in connection with the CCTV system

  GROUP 2: Operation of hot water heaters and circulation
  systems, water jetters and vacuum and mechanical debris
  removal systems
----------------------------------------------------------------
 ENGI0324-010 09/01/2009

ST. CLAIR COUNTY:

                                   Rates          Fringes

POWER EQUIPMENT OPERATOR  
     GROUP  1....................$ 37.99            17.80
     GROUP  2....................$ 36.49            17.80
     GROUP  3....................$ 34.99            17.80
     GROUP  4....................$ 34.69            17.80
     GROUP  5....................$ 33.87            17.80
     GROUP  6....................$ 33.01            17.80
     GROUP  7....................$ 32.04            17.80
     GROUP  8....................$ 30.33            17.80
     GROUP  9....................$ 23.02            17.80
     GROUP 10....................$ 21.99            17.80

  FOOTNOTES: Tower cranes: to be paid the crane operator rate
  determined by the combined length of the mast and the boom.
  If the worker must climb 50 ft. or more to the work
  station, $.25 per hour additional. Derrick and cranes where
  the operator must climb 50 ft. or more to the work station,
  $.25 per hour additional to the applicable crane operator
  rate.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS  

GROUP 1: Crane with boom & jib or leads 400' or longer  

GROUP 2: Crane with boom & jib or leads 300' or longer  

GROUP 3: Crane with boom & jib or leads 220' or longer  

GROUP 4: Crane with boom & jib or leads 140' or longer  

GROUP 5: Crane with boom & jib or leads 120' or longer  

  GROUP 6: Regular crane operator, job mechanic, and concrete
  pump with boom operator

  GROUP 7: Regular engineer, Hydro-Excavator, Remote Controlled
  Concrete Breaker

  GROUP 8: Engineer when operating forklift, lull,
  extend-a-boom   forklift

  GROUP 9: Engineer when operating compressor or welding
  machine

GROUP 10: Fire tender or oiler
----------------------------------------------------------------
 ENGI0324-011 06/01/2009

                                   Rates          Fringes

POWER EQUIPMENT OPERATOR   
(Steel Erection)  
     GROUP  1....................$ 42.47            18.35
     GROUP  2....................$ 43.47            18.35
     GROUP  3....................$ 40.97            18.35
     GROUP  4....................$ 41.97            18.35
     GROUP  5....................$ 39.47            18.35
     GROUP  6....................$ 40.47            18.35
     GROUP  7....................$ 39.20            18.35
     GROUP  8....................$ 40.20            18.35
     GROUP  9....................$ 38.75            18.35
     GROUP 10....................$ 39.75            18.35
     GROUP 11....................$ 38.02            18.35
     GROUP 12....................$ 39.02            18.35
     GROUP 13....................$ 37.66            18.35
     GROUP 14....................$ 38.66            18.35
     GROUP 15....................$ 37.02            18.35
     GROUP 16....................$ 30.21            18.35
     GROUP 17....................$ 28.80            18.35
     GROUP 18....................$ 35.57            18.35

FOOTNOTE:

  Paid Holidays: New Year's Day, Memorial Day, Fourth of July,
  Labor Day, Thanksgiving Day and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

  GROUP 1: Engineer when operating combination of boom and jib
  400' or longer

  GROUP 2: Engineer when operating combination of boom and jib
  400' or longer on a crane that requires an oiler

  GROUP 3: Engineer when operating combination of boom and jib
  300' or longer

  GROUP 4: Engineer when operating combination of boom and jib
  300' or longer on a crane that requires an oiler

  GROUP 5: Engineer when operating combination of boom and jib
  220' or longer

  GROUP 6: Engineer when operating combination of boom and jib
  220' or longer on a crane that requires an oiler

  GROUP 7: Engineer when operating combination of boom and jib
  140' or longer

  GROUP 8: Engineer when operating combination of boom and jib
  140' or longer on a crane that requires an oiler

  GROUP 9: Tower crane and derrick operator (where operator's
  work station is 50 ft. or more above first sub-level)

  GROUP 10: Tower crane and derrick operator (where operator's
  work station is 50 ft. or more above first sub-level) on a
  crane that requires an oiler

  GROUP 11: Engineer when operating combination of boom and jib
  120' or longer

  GROUP 12: Engineer when operating combination of boom and jib
  120' or longer on a crane that requires an oiler

  GROUP 13: Crane operator; job mechanic; 3 drum hoist and
  excavator

GROUP 14: Crane operator on a crane that requires an oiler

  GROUP 15: Hoisting operator; 2 drum hoist and rubber tire
  backhoe

GROUP 16: Compressor or welder operator

GROUP 17: Oiler

GROUP 18: Forklift and 1 drum hoist
----------------------------------------------------------------
 ENGI0324-013 09/01/2009

AREA 1: Genesee, Lapeer and St. Clair
AREA 2:  Bay, Midland, Saginaw, Huron and Sasnilac

                                   Rates          Fringes

POWER EQUIPMENT OPERATOR   
(Undergound construction-   
includes sewer)  
     AREA 1:
      GROUP 1....................$ 29.28            17.85
      GROUP 2....................$ 24.55            17.85
      GROUP 3....................$ 23.82            17.85
      GROUP 4....................$ 23.25            17.85
POWER EQUIPMENT OPERATOR   
(Underground construction-   
includes sewer)  
     AREA 2:
      GROUP 1....................$ 27.57            17.85
      GROUP 2....................$ 22.68            17.85
      GROUP 3....................$ 22.18            17.85
      GROUP 4....................$ 21.90            17.85

POWER EQUIPMENT OPERATOR CLASSIFICATIONS

  GROUP 1: Backfiller tamper; Backhoe; Batch plant operator
  (concrete); Clamshell; Concrete paver (2 drums or larger);
  Conveyor loader (Euclid type); Crane (crawler, truck type
  or pile driving); Dozer; Dragline; Elevating grader;
  Endloader; Gradall (and similar type machine); Grader;
  Mechanic; Power shovel; Roller (asphalt); Scraper
  (self-propelled or tractor drawn); Side boom tractor (type
  D-4 or equivalent and larger); Slip form paver; Slope
  paver; Trencher (over 8 ft. digging capacity); Well
  drilling rig; Concrete pump with boom operator; Hydro
  Excavator

  GROUP 2: Boom truck (power swing type boom); Crusher; Hoist;
  Pump (1 or more-6-in. discharge or larger-gas or
  diesel-powered or powered by generator of 300 amperes or
  more-inclusive of generator); Side boom tractor (smaller
  than type D-4 or equivalent); Tractor (pneu-tired, other
  than backhoe or front end loader); Trencher (8-ft. digging
  capacity and smaller) ; Vac Truck

  GROUP 3: Air compressors (600 cfm or larger); Air compressors
  (2 or more-less than 600 cfm); Boom truck (non-swinging,
  non-powered type boom); Concrete breaker (self-propelled or
  truck mounted - includes compressor); Concrete paver (1
  drum-l/2 yd. or larger); Elevator (other than passenger);
  Maintenance person; Pump (2 or more-4-in. up to 6-in.
  discharge-gas or diesel powered-excluding submersible
  pumps); Pumpcrete machine (and similar equipment); Wagon
  drill (multiple); Welding machine or generator (2 or
  more-300 amp. or larger-gas or diesel powered)

  GROUP 4: Boiler; Concrete saw (40 hp or over); Curing machine
  (self-propelled); Farm tractor (with attachment); Finishing
  machine (concrete); Fire person; Hydraulic pipe pushing
  machine; Mulching equipment; Oiler; Pumps (2 or more up to
  4-in. discharge, if used 3 hours or more a day, gas or
  diesel powered-excluding submersible pumps); Roller (other
  than asphalt); Stump remover; Trencher (service); Vibrating
  compaction equipment, self-propelled (6 ft. wide or over);
  End dump operator; Sweeper (Wayne type and similar
  equipment); Water Wagon, Extend-a-boom Forklift
----------------------------------------------------------------
 ENGI0324-014 05/01/2009

BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

POWER EQUIPMENT OPERATOR  
     GROUP 1.....................$ 28.39            17.80
     GROUP 2.....................$ 28.14            17.80
     GROUP 3.....................$ 27.04            17.80
     GROUP 4.....................$ 22.24            17.80
     GROUP 5.....................$ 21.64            17.80
     GROUP 6.....................$ 19.19            17.80
     GROUP 7.....................$ 17.49            17.80

FOOTNOTES: 

Certified Crane Operator Premiums: 
  
  a) Swing Boom Truck Operator over 12 tons-$.50 per hour
  b) Hydraulic Crane Operator 75 tons and under-$.75 per hour
  c) Hydraulic Crane Operator over 75 tons-$1.00 per hour
  d) Lattiee Boom Crane Operator-$1.50 per hour

  Crane operator with main boom and jib 300' or longer: $1.50
  per hour above the group 1 rate. Crane operator with main
  boom and jib 400' or longer: $3.00 per hour above the group
  1 rate.

  PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July,
  Labor Day, Thanksgiving Day and Christmas Day.

POWER EQUIPMENT OPERATOR CLASSIFICATIONS    

  GROUP 1: Crane operator with main boom and jib 400', 300', or
  220' or longer. Tower crane operator with CCO certification
  for combined length of mast and boom 220' or longer

  GROUP 2: Crane operator with main boom and jib 140' or
  longer, tower cranes (Operators without CCO certification,
  or less than 220' length), gantry crane, whirley derrick

  GROUP 3: Regular equipment operator; crane, stiff leg
  derrick, scraper, dozer, grader, front end loader, hoist,
  job mechanic, concrete pump truck, hydro excavators

  GROUP 4: Air tugger (single drum), material hoist, boiler
  operator, sweeping machine, winch truck, Bobcat and similar
  equipment, fork truck (over 20 ft. lift), elevators( when
  operated by an operating engineer

  GROUP 5: Pump, 6 in. or over; Well points, freeze systems,
  boom truck (non-swinging); end dumps and laser/power
  screed; concrete wire saw (20 h.p. and over), brokk
  concrete breaker

  GROUP 6: Air compressor, welder, generator, conveyor, pump
  under 6", grease person and fork truck (20 ft. lifting
  capacity or less when working on masonry work)

GROUP 7: Oiler, fire tender and heater operator
----------------------------------------------------------------
 ENGI0324-029 10/01/2009

AREA 1: BAY, SAGINAW, TUSCOLA, HURON AND SANILAC COUNTIES

AREA 2: GENESEE, LAPEER AND  ST. CLAIR COUNTIES

                                   Rates          Fringes

Power equipment operators -   
hazardous waste removal:   
(AREA 1)  
     LEVEL A:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 32.77            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 33.07            17.80
      GROUP 1....................$ 30.12            17.80
      GROUP 2....................$ 25.72            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator, concrete pump 
      with boom operator,  
      Power Shovel Operator......$ 31.09            17.80
     LEVEL B AND C:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 31.71            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 32.03            17.80
      GROUP 1....................$ 29.17            17.80
      GROUP 2....................$ 24.78            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator, concrete pump 
      with boom operator, Power 
      Shovel Operator............$ 30.14            17.80
     LEVEL D WHEN CAPPING 
     LANDFILL:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 30.27            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 30.57            17.80
      GROUP 1....................$ 27.62            17.80
      GROUP 2....................$ 23.23            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator and concrete 
      pump with boom operator, 
      power shovel operators.....$ 28.59            17.80
     LEVEL D:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 30.52            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 30.82            17.80
      GROUP 1....................$ 27.87            17.80
      GROUP 2....................$ 23.48            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator, concrete pump 
      with boom operator, Power 
      Shovel Operator............$ 28.84            17.80
Power equipment operators -   
hazardous waste removal:   
(AREA 2)  
     LEVEL A:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 34.48            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 34.78            17.80
      GROUP 1....................$ 31.83            17.80
      GROUP 2....................$ 27.60            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator,  power shovel 
      operator, concrete pump 
      with boom operator.........$ 32.80            17.80
     LEVEL B AND C:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 33.53            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 33.83            17.80
      GROUP 1....................$ 30.88            17.80
      GROUP 2....................$ 26.65            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator, concrete pump 
      with boom operator, power 
      shovel operator............$ 31.85            17.80
     LEVEL D WHEN CAPPING 
     LANDFILL:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 31.98            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 32.28            17.80
      GROUP 1....................$ 29.33            17.80
      GROUP 2....................$ 25.10            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator, concrete pump 
      with boom operator, power 
      shovel operator............$ 29.68            17.80
     LEVEL D:
      Engineer when operating 
      crane with boom and jib 
      or leads 140' or longer....$ 32.23            17.80
      Engineer when operating 
      crane with boom and jib 
      or leads 220' or longer....$ 32.53            17.80
      GROUP 1....................$ 29.58            17.80
      GROUP 2....................$ 25.35            17.80
      Regular crane operator, 
      mechanic, dragline 
      operator, boom truck 
      operator, concrete pump 
      with boom operator, power 
      shovel operator............$ 30.55            17.80

HAZARDOUS WASTE REMOVAL CLASSIFICATIONS    

  GROUP 1: Backhoe, batch plant operator, clamshell, concrete
  breaker when attached to hoe, concrete cleaning
  decontamination machine operator, concrete pump, concrete
  paver, crusher, dozer, elevating grader, endloader, farm
  tractor (90 h.p. and higher), gradall, grader, heavy
  equipment robotics operator, loader, pug mill, pumpcrete
  machines, pump trucks, roller, scraper (self-propelled or
  tractor drawn), side boom tractor, slip form paver,
  trencher, ultra high pressure waterjet cutting tool system
  operator, vactors, vacuum blasting machine operator,
  vertical lifting hoist, vibrating compaction equipment
  (self- propelled), well drilling rig, slope paver and hydro
  excavator

  GROUP 2: Air compressor, concrete breaker when not attached
  to hoe, elevator, end dumps, equipment decontamination
  operator, farm tractor (less than 90 h.p.), forklift,
  generator, heater, mulcher, pigs (portable reagent storage
  tanks), power screens, pumps (water), stationary compressed
  air plant, sweeper, welding machine and water wagon
----------------------------------------------------------------
 ENGI0326-004 05/01/2009

                                   Rates          Fringes

Power equipment operators -   
gas distribution and duct   
installation work:  
     MACOMB, MONROE, OAKLAND,  
     ST. CLAIR, WASHTENAW and 
     WAYNE COUNTY:
      GROUP 1....................$ 25.98            17.80
      GROUP 2....................$ 25.85            17.80
      GROUP 3....................$ 24.72            17.80
      GROUP 4....................$ 24.15            17.80
     REMAINDER OF COUNTIES:
      GROUP 1....................$ 25.07            17.80
      GROUP 2-A..................$ 24.97            17.80
      GROUP 2-B..................$ 24.75            17.80
      GROUP 3....................$ 23.97            17.80
      GROUP 4....................$ 23.47            17.80

SCOPE OF WORK:
  The construction, installation, treating and reconditioning
  of pipelines transporting gas vapors within cities, towns,
  subdivisions, suburban areas, or within private property
  boundaries, up to and including private meter settings of
  private industrial, governmental or other premises, more
  commonly referred to as "distribution work", starting from
  the first metering station, connection, similar or related
  facility, of the main or cross country pipeline and
  including duct installation.

POWER EQUIPMENT - GAS DISTRIBUTION CLASSIFICATIONS   

Macomb, Monroe, Oakland, St.Clair, Washtenaw and Wayne:  

  GROUP 1: Backhoe, crane, grader, mechanic, dozer (D-6
  equivalent or larger), side boom (D-4 equivalent or
  larger), trencher(except service), endloader (2 yd.
  capacity or greater).
  GROUP 2: Dozer (less than D-6 equivalent), endloader (under 2
  yd. capacity), side boom (under D-4 capacity), backfiller,
  pumps (1 or 2 of 6-inch discharge or greater), boom truck
  (with powered boom), tractor (wheel type other than backhoe
  or front endloader).

  GROUP 3: Tamper (self-propelled), boom truck (with
  non-powered boom), concrete saw (20 hp or larger), pumps (2
  to 4 under 6-inch discharge), compressor (2 or more or when
  one is used continuously into the second day),
  trencher(service),

  GROUP 4: Oiler, hydraulic pipe pushing machine, grease person
  and hydrostatic testing operator.

REMAINDER OF COUNTIES:    

  GROUP 1: Mechanic, crane (over 1/2 yd. capacity), backhoe
  (over 1/2 yd. capacity), grader (Caterpillar 12 equivalent
  or larger)

  GROUP 2-A: Trencher(except service), backhoe (1/2 yd.
  capacity or less)

  GROUP 2-B: Crane (1/2 yd. capacity or less), compressor (2 or
  more), dozer (D-4 equivalent or larger), endloader (1 yd.
  capacity or larger), pump (1 or 2 six-inch or larger), side
  boom (D-4 equivalent or larger).

  GROUP 3: Backfiller, boom truck (powered), concrete saw (20
  hp or larger), dozer (less than D-4 equivalent), endloader
  (under 1 yd. capacity), farm tractor (with attachments),
  pump (2 - 4 under six-inch capacity), side boom tractor
  (less than D-4 equivalent), tamper (self-propelled),
  trencher(service) and Grader(maintenance).

GROUP 4: Oiler, grease person, hydrostatic testing operator
----------------------------------------------------------------
 IRON0025-005 06/01/2009

                                   Rates          Fringes

IRONWORKER  
     Decking.....................$ 24.39            24.32
     Fence Erector; Sound 
     Barrier & Guardrail 
     Erection/Installation; 
     Exterior Signage Work
      GENESEE COUNTY.............$ 24.25             6.40
      OTHER COUNTIES.............$ 20.25             6.40
     Machinery Movers, Riggers, 
     Machinery Erectors..........$ 27.97            28.86
     Ornamental, structural, 
     precast erector.............$ 29.26            27.62
     Reinforced..................$ 26.83            24.26
     Siding......................$ 21.51            20.22
----------------------------------------------------------------
 IRON0025-008 04/01/2008

                                   Rates          Fringes

IRONWORKER (Pre-engineered   
metal building)  
     BAY, SAGINAW AND TUSCOLA 
     COUNTIES....................$ 20.13            19.97
     GENESEE, LAPEER AND ST. 
     CLAIR COUNTIES..............$ 21.35            20.27
----------------------------------------------------------------
 IRON0025-023 06/01/2009

                                   Rates          Fringes

IRONWORKER  
     Machinery mover, rigger 
     and machinery erector.......$ 27.97            28.86
----------------------------------------------------------------
 LABO0005-012 10/01/2008

AREA 1: BAY, SAGINAW AND TUSCOLA COUNTIES

AREA 2: GENESEE AND LAPEER COUNTIES

AREA 3: ST. CLAIR COUNTY

                                   Rates          Fringes

Laborers - hazardous waste   
abatement:  
     AREA 1
      Level A, B or C............$ 21.86             9.75
      Work performed in 
      conjunction with site 
      preparation not requiring 
      the use of personal 
      protective equipment; 
      Also, Level D..............$ 20.86             9.75
     AREA 2
      Level A, B or C............$ 22.28             9.88
      Work performed in 
      conjunction with site 
      preparation not requiring 
      the use of personal 
      protective equipment; 
      Also, Level D..............$ 21.28             9.88
     AREA 3
      Work performed inside the 
      building and up to and 
      including 5 ft. outside 
      the building: (Work 
      performed in conjunction 
      with site preparation) 
      not requiring the use of 
      personal protective 
      equipment; Also, Level D...$ 24.83            11.38
      Work performed inside the 
      building and up to and 
      including 5 ft. outside 
      the building: Level A, B 
      or C.......................$ 25.83            11.38
      Work performed over 5 ft. 
      outside the building: 
      (Work performed in 
      conjunction with site 
      preparation) not 
      requiring the use of 
      personal protective 
      equipment; Also, Level D...$ 20.30             9.80
      Work performed over 5 ft. 
      outside the building: 
      Level A, B or C............$ 21.30             9.80
----------------------------------------------------------------
 LABO0259-010 08/01/2009

                                   Rates          Fringes

Asbestos Laborer  
     Includes removing and
     
     disposing of all 
     insulation
     
     materials from walls, 
     ceilings, floors, columns, 
     and all other non-
     mechanical surfaces;
     
     and removal of insulating
     
     materials from mechanical
     
     systems that are to be
     
     demolished;loading/unloading 
     of bagged and tagged 
     materials at the disposal 
     site (includes lead paint 
     abatement clean-up).........$ 24.23            11.30
----------------------------------------------------------------
 LABO0259-012 09/01/2009

                                   Rates          Fringes

Laborers - tunnel, shaft and   
caisson:  
     GROUP 1.....................$ 21.37            10.95
     GROUP 2.....................$ 21.46            10.95
     GROUP 3.....................$ 21.56            10.95
     GROUP 4.....................$ 21.72            10.95
     GROUP 5.....................$ 21.98            10.95
     GROUP 6.....................$ 22.29            10.95
     GROUP 7.....................$ 14.56            10.95

  SCOPE OF WORK: Tunnel, shaft and caisson work of every type
  and descripton and all operations incidental thereto,
  including, but not limited to, shafts and tunnels for
  sewers, water, subways, transportation, diversion,
  sewerage, caverns, shelters, aquafers, reservoirs, missile
  silos and steel sheeting for underground construction.

LABORER CLASSIFICATIONS    

  GROUP 1: Tunnel, shaft and caisson laborer, dump, shanty, hog
  house tender, testing (on gas)

  GROUP 2: Manhole, headwall, catch basin builder, bricklayer
  tender, mortar, material mixer, fence erector and guard
  rail builder

  GROUP 3: Air tool operator (jackhammer, bush hammer and
  grinder), first bottom, second bottom, cage tender, car
  pusher, carrier, concrete, concrete form, concrete repair,
  cement invert laborer, cement finisher, concrete shoveler,
  conveyor, floor, gasoline and electric tool operator,
  gunite, grout
  operator, welder, heading dinky person, inside lock tender,
  pea gravel operator, pump, outside lock tender, scaffold,
  top signal person, switch person, track, tugger, utility
  person, vibrator, winch operator, pipe jacking, wagon drill
  and air track operator and concrete saw operator (under 40
  h.p.)

  GROUP 4: Tunnel, shaft and caisson mucker, bracer, liner
  plate, long haul dinky driver and well point

  GROUP 5: Tunnel, shaft and caisson miner, drill runner, key
  board operator, power knife operator, reinforced steel or
  mesh (e.g. wire mesh, steel mats, dowel bars, etc.)

GROUP 6: Dynamite and powder    

  GROUP 7: Restoration laborer, seeding, sodding, planting,
  cutting, mulching and top soil grading; and the restoration
  of property such as replacing mailboxes, wood chips,
  planter boxes, flagstones, etc.
----------------------------------------------------------------
 LABO0334-007 09/01/2009

                                   Rates          Fringes

Laborers - open cut:  
     BAY, SAGINAW, TUSCOLA 
     COUNTIES:
      GROUP 1....................$ 18.22            10.95
      GROUP 2....................$ 18.35            10.95
      GROUP 3....................$ 18.46            10.95
      GROUP 4....................$ 18.53            10.95
      GROUP 5....................$ 18.65            10.95
      GROUP 6....................$ 15.87            10.95
      GROUP 7....................$ 14.21            10.95
     GENESEE, LAPEER AND ST. 
     CLAIR COUNTIES:
      GROUP 1....................$ 19.21            10.95
      GROUP 2....................$ 19.35            10.95
      GROUP 3....................$ 19.47            10.95
      GROUP 4....................$ 19.52            10.95
      GROUP 5....................$ 19.66            10.95
      GROUP 6....................$ 16.96            10.95
      GROUP 7....................$ 14.11            10.95

  SCOPE OF WORK: Open cut construction work shall be construed
  to mean work which requires the excavation of earth
  including industrial, commercial and residential building
  site excavation and preparation, land balancing, demolition
  and removal of concrete and underground appurtenances,
  grading, paving, sewers, utilities and improvements;
  retention, oxidation, flocculation and irrigation
  facilities, and also including but not limited to
  underground piping, conduits, steel sheeting for
  underground construction, and all work incidental thereto,
  and general excavation. Open cut construction work shall
  also be construed to mean waterfront work, piers, docks,
  seawalls, breakwalls, marinas and all incidental work. Open
  cut construction work shall not include any structural
  modifications, alterations, additions and repairs to
  buildings, or highway work, including roads, streets,
  bridge construction and parking lots or steel erection work
  and excavation for the building itself and back filling
  inside of and within 5 ft. of the building and foundations,
  footings and piers for the building. Open cut construction
  work shall not include any work covered under Tunnel, Shaft
  and Caisson work.

OPEN CUT LABORER CLASSIFICATIONS    

GROUP 1: Construction laborer   

  GROUP 2: Mortar and material mixer, concrete form person,
  signal person, well point person, manhole, headwall and
  catch basin builder, guard rail builder, headwall, seawall,
  breakwall, dock builder and fence erector

  GROUP 3: Air, gasoline and electric tool operator, vibrator
  operator, driller, pump person, tar kettle operator,
  bracer, rodder, reinforced steel or mesh person (e.g. wire
  mesh, steel mats, dowel bars, etc.), welder, pipe jacking
  and boring person, wagon drill and air track operator and
  concrete saw operator (under 40 h.p.), windlass and tugger
  person and directional boring person, cement finisher

GROUP 4: Trench or excavating grade person    

  GROUP 5: Pipe layer (including crock, metal pipe, multi-plate
  or other conduits)

  GROUP 6: Grouting person, audio-visual television operations
  and all other operations in connection with closed circuit
  television inspection, pipe cleaning and pipe relining
  work, installation and repair of water service pipe and
  appurtenances

  GROUP 7: Restoration laborer, seeding, sodding, planting,
  cutting, mulching and top soil grading; and the restoration
  of property such as replacing mailboxes, wood chips,
  planter boxes, flagstones, etc.
----------------------------------------------------------------
 LABO0334-017 07/01/2009

                                   Rates          Fringes

Landscape Laborer  
     ALL COUNTIES, EXCEPT 
     WASHTENAW,,GENESEE, 
     LAPEER, SHIAWASSEE, 
     OAKLAND, WAYNE, MONROE, 
     LIVINGSTON, ST. CLAIR, 
     MACOMB
      GROUP 1....................$ 18.63             6.00
     All COUNTIES, EXCEPT 
     WASHTENAW,,GENESEE, 
     LAPEER, SHIAWASSEE, 
     OAKLAND, WAYNE, MONROE, 
     LIVINGSTON, ST. CLAIR, 
     MACOMB
      GROUP 2....................$ 14.43             6.00
     WASHTENAW,GENESEE, LAPEER, 
     SHIAWASSEE, OAKLAND, 
     WAYNE, MONROE, LIVINGSTON, 
      ST. CLAIR, MACOMB
      GROUP 2....................$ 15.14             6.00
     WASHTENAW,GENESEE, 
     LAPEER,SHIAWASSEE, 
     OAKLAND, WAYNE, MONROE, 
     LIVINGSTON,  ST. CLAIR, 
     MACOMB
      GROUP 1....................$ 19.36             6.00

LANDSCAPE LABORER CLASSIFICATIONS    

  GROUP 1: Landscape specialist, including air, gas and diesel
  equipment operator and lawn sprinkler installer

  GROUP 2: Landscape laborer: small power tool operator,
  material mover,truck driver and lawn sprinkler installer
  tender
----------------------------------------------------------------
 LABO0463-002 06/01/2009

ST. CLAIR COUNTY:

                                   Rates          Fringes

Laborers:  
     Signal man and top 
     man(sewer work); tunnel 
     muckers; jackhammer and 
     air spade operators; 
     tunnel men (concrete 
     shovelers, car pushers); 
     bottom men(sewer work); 
     windlass operators(caisson 
     work); mason tender; 
     demolition laborer, when 
     full time fire watch is 
     required by the contractor 
     signatory to this 
     agreement, the laborers 
     will be utilized to supply 
     fire watch, Industrial 
     deep cleaning; cement 
     finisher tender; carpenter 
     tender; Watchman; Mortar 
     mixer (with training) (by 
     hand or machine); air, 
     electric, gas tool 
     operator; air and electric 
     bush hammer; Plasterer 
     tender; concrete gas; pump 
     operators (all 3" pumps 
     and below); concrete gas 
     buggy; concrete saw 
     operator; crock and pipe 
     layers(conduit and 
     vitrified tile, except 4" 
     drain tile around 
     buildings) and caisson 
     work inside building........$ 23.47            13.25

FOOTNOTES:   

  Height pay: Work on stacks, towers, power houses and silos
  shall be paid at the rate of pay as follows: 25 ft. to 100
  ft.: $.30 per hour above the group 1 rate. For each
  additional fifty feet (50') height: $.30 additional per
  hour for each additional fifty foot(50') height.

Demolition burner: $1:00 per hour additional
----------------------------------------------------------------
 LABO1075-002 06/01/2009

GENESEE AND LAPEER COUNTIES:

                                   Rates          Fringes

Laborers:  
     (Includes carpenter 
     tender; mason tender; 
     cement finisher tender; 
     plasterer tender; signal 
     person and top person 
     (sewer work); air, fuel or 
     electric powered tool 
     operator; crock and pipe 
     layer (conduit and 
     vitrified tile, except 4" 
     drain tile around 
     buildings; caisson worker 
     inside building; tunnel 
     mucker; jackhammer and air 
     spade operator; tunnel 
     person (concrete shoveler, 
     car pusher); bottom person 
     (sewer work); windlass 
     operator (caisson work); 
     watchman; morter mixer; 
     air and electric bush 
     hammers; concrete saw 
     operator; concrete gas 
     buggy; demoition laborer; 
     firewatch; industrial deep 
     cleaning and pump 
     operators(all 3 inch pumps 
     and below)..................$ 21.64            11.21

FOOTNOTE: Demolition burner: $1.00 per hour additional.

Height Pay:

  Height premium pay on all stacks, towers, church spires,
  power houses and silos shall be paid at the following rate:

25 feet to 100 feet: $.30 above the class A rate.

  For each additional 50' height: Additional $.30 per hour for
  each additional 50' height.
----------------------------------------------------------------
 LABO1076-006 04/01/2009

ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,
BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KEWEENAW, LAKE, LAPEER,  LEELANAU, LENAWEE, LIVINGSTON, LUCE,
MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,
MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,
MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,
OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.
CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,
VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES

                                   Rates          Fringes

LABORER (Distribution rates)  
     Telephone Work  (Zone 1)....$ 17.79            10.95
     Telephone Work  (Zone 2)....$ 16.41            10.95
     Telephone Work: (Zone 3)....$ 12.49            10.95
     Telephone Work: (Zone 4)....$ 12.86            10.95
     Telephone Work: (Zone 5)....$ 12.16            10.95
     Zone 1: All other work......$ 17.79            10.95
     Zone 2: All other work......$ 16.41            10.95
     Zone 3: All other work......$ 14.69            10.95
     Zone 4: All other work......$ 14.06            10.95
     Zone 5: All other work......$ 14.06            10.95

SCOPE OF WORK: 

  Construction, installation, treating and reconditioning of
  distribution pipelines transporting coal, oil, gas, or
  other similar materials, vapors or liquids, including
  portions of such pipelines within private property
  boundaries, up to and including the meter settings on
  residential, commercial, industrial, institutional, private
  and public structures. All work covering pumping stations
  and tank farms not covered under another rate. Distribution
  work also includes all other distribution lines for public
  utilities except sewer, water and cable television, but
  including telephone lines and duct.

Duct Work Pay: $.40 per hour above the base pay rate.

Zones:

Zone 1-Macomb,Oakland and Wayne
Zone 2-Monroe and Washtenaw
  Zone 3-Bay, Genesee, Lapeer, Midland, Saginaw, Sanilac,
  Shiawassee and St. Clair
  Zone 4-Alger, Baraga, Chippewa, Delta, Dickinson,Gogebic,
  Houghton, Iron, Keweenaw, Luce, Mackinaw, Marquette,
  Menominee, Ontonagon and Schoolcraft
Zone 5-Remaining counties in Michigan
----------------------------------------------------------------
 LABO1098-009 06/30/2009

BAY, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

Laborers:  
     GROUP 1.....................$ 18.71            10.95
     GROUP 2.....................$ 19.21            10.95
     GROUP 3.....................$ 19.71            10.95

LABORER CLASSIFICATIONS    

  GROUP 1: All construction laborers except workers falling
  within specified classifications; Also, pumps with a 3-in.
  or less discharge and not hooked up in battery; mechanized
  buggy operators & mortar mixer (when done by hand), mason
  tender, carpenter tender, cement finisher tender, fire
  watch, mechanized morter mixing, air, electric and
  gas-driven tools, concrete vibrators, plasterer tenders and
  plaster mixers, crock and/or pipelayers, signal men and top
  men on caisson work. Demolition Laborer

  GROUP 2: Air or electric driven pavement breakers, Tunnel
  miner, tunnel mucker and tunnel and shaft underpinning
  contributing to the structural support of buildings and
  jackhammers over 50 lbs.

  GROUP 3: Driller & blaster, burner & welder; Also, refractory
  work: Work inside or outside digesters, tanks, lime kilns,
  chests, boilers and boiler tubes, heat treat ovens, and
  smoke stacks, including the handling of acid, chlorine,
  chemicals, epoxies, liquids and cleaning of existing
  precipitators, hydro blasting, hydro washing, and
  sandblasting
----------------------------------------------------------------
 PAIN0357-002 06/01/2009

ST. CLAIR COUNTY:

                                   Rates          Fringes

GLAZIER..........................$ 29.20            16.01

  PAID HOLIDAYS: New Year's Day, Decoration Day, Fourth of
  July, Labor Day, Thanksgiving Day and Christmas Day;
  provided that the employee has worked the last full regular
  scheduled work day prior to the holiday, and the first full
  regular scheduled work day following the holiday, provided
  the employee is physically able to work.
----------------------------------------------------------------
 PAIN0826-002 07/01/2009

BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

GLAZIER..........................$ 27.63            12.47

  PAID HOLIDAYS:  New Years Day, Memorial Day, Fourth of July,
  Labor Day, Thanksgiving Day and Christmas Day.

FOOTNOTES:  

  High pay: Work from any mechanical lift, regardless of the
  height off of the surface: $0.75 per hour additional.
  Working from scaffolding shall be paid at the premium rate
  only when the working platform is at twenty (20) feet or
  above. All swing stage work to be paid at the premium rate.
  Working from a ladder at twenty (20) feet or above
  qualifies for the premium rate. Premium pay is only to be
  paid for the actual time worked on the lift device,
  scaffold, or ladder.
----------------------------------------------------------------
 PAIN1052-001 12/01/2009

GENESEE COUNTY; AND LAPEER COUNTY (west of Hwy. M-53):

                                   Rates          Fringes

PAINTER..........................$ 22.25            10.77

FOOTNOTES:   

  Lead abatement work: $1.50 per hour additional. Application
  of paint by pressure roller: $.80 per hour additional. Sand
  blasting, steam cleaning, acid cleaning, and all work
  ordinarily performed as such: $1.00 per hour additional.
  Swing stage, boatswain chair, window jacks and all work
  performed over a falling height of 30 ft.: $.30 per hour
  additional. For each aditional 15 ft. of height: $.10 per
  hour additional. All industrial spray gun work, pick
  pullers and those handling needles also for cleaning by
  blowing off by air pressure: $1.00 per hour additional.
  Commercial spray rate shall be paid only on deck and truss:
  $.30 per hour additional. All work such as steeplejack,
  tanks, gas holders, stacks, flag poles, radio towers and
  beacons, power line towers, bridges, etc.: $.65 per hour
  additional, paid from the ground up. Application of paint
  by use of a mitt: $.35 per hour additional.
----------------------------------------------------------------
 PAIN1052-004 12/01/2009

GENESEE COUNTY; AND LAPEER COUNTY (west of Hwy. M-53):

                                   Rates          Fringes

DRYWALL FINISHER/TAPER  
     Drywall sanding.............$ 24.27            10.67
     Hand work...................$ 24.67            10.67
     Machine work................$ 24.97            10.67
----------------------------------------------------------------
 PAIN1474-004 06/01/2009

LAPEER COUNTY (east of Hwy. M-53); ST. CLAIR AND TUSCOLA
COUNTIES:

                                   Rates          Fringes

PAINTER (Including drywall   
finisher)........................$ 23.90            11.51

FOOTNOTES:   
Lead abatement work: $1.00 per hour additional.
  Paperhanging: $1.00 per hour additional.Work with any
  hazardous material: $1.00 per hour additional.Sandblasting,
  steam cleaning and acid cleaning: $1.00 per hour
  additional.Ladder work at or above 40 ft., scaffold work at
  or above 40 ft., swing stage, boatswain chair, window jacks
  and all work performed over a falling height of 40 ft.:
  $1.00 per hour additional.Spray gun work, pick pullers and
  those handling needles, blowing off by air pressure, and
  any person rigging (setting up and moving off the groupnd):
  $1.00 per hour additional.Steeplejack, tanks, gas holders,
  stacks, flag poles, radio towers and beacons, power line
  towers, bridges, etc.: $1.00 per hour additonal, paid from
  the ground up.
----------------------------------------------------------------
 PAIN1803-001 06/01/2009

BAY AND SAGINAW COUNTIES:

                                   Rates          Fringes

PAINTER  
     Work performed on water, 
     bridges over water or 
     moving traffic, radio and 
     powerline towers, elevated 
     tanks, steeples, smoke 
     stacks over 40 ft. of 
     falling heights, recovery 
     of lead-based paints and 
     any work associated with 
     industrial plants, except 
     maintenance of industrial 
     plants......................$ 23.20            10.85
     All other work, including  
     maintenance of industrial 
     plants......................$ 21.78            10.75

FOOTNOTES:   

  Spray painting, sandblasting, blowdown associated with
  spraying and blasting, water blasting and work involving a
  swing stage, boatswain chair or spider: $1.00 per hour
  additional.All work performed inside tanks, vessels, tank
  trailers, railroad cars, sewers, smoke stacks, boilers or
  other spaces having limited egress not including buildings,
  opentop tanks, pits, etc.: $1.25 per hour additional. Work
  involving the installation of wallcoverings: $0.30 cents
  per hour additional.
----------------------------------------------------------------
 PAIN1803-009 06/01/2009

BAY AND SAGINAW COUNTIES:

                                   Rates          Fringes

DRYWALL FINISHER/TAPER...........$ 22.79            11.70
----------------------------------------------------------------
 PLAS0016-001 06/01/2008

GENESEE COUNTY:

                                   Rates          Fringes

CEMENT MASON/CONCRETE FINISHER...$ 25.94            10.55
PLASTERER........................$ 24.71            10.40

FOOTNOTES:   

  Swing stage: $.50 per hour additional.Gun machine operator:
  $.50 per hour additional.
----------------------------------------------------------------
 PLUM0085-003 05/04/2009

                                   Rates          Fringes

PLUMBER (Including Pipefitter)...$ 30.38            17.19
----------------------------------------------------------------
 PLUM0098-003 06/04/2007

ST. CLAIR COUNTY:

                                   Rates          Fringes

PLUMBER..........................$ 35.16            19.65
----------------------------------------------------------------
 PLUM0190-006 05/01/2008

                                   Rates          Fringes

Gas Distribution Pipeline  
     Welding in conjunction 
     with gas distribution 
     pipeline work...............$ 27.63            15.64
     All other work..............$ 20.26             9.90
----------------------------------------------------------------
 PLUM0370-002 06/04/2007

GENESEE AND LAPEER COUNTIES:

                                   Rates          Fringes

PLUMBER/PIPEFITTER...............$ 33.96            18.45

  FOOTNOTE: Welding of galvanized material: $1.00 per hour
  additional.
----------------------------------------------------------------
 PLUM0636-004 07/28/2008

ST. CLAIR COUNTY:

                                   Rates          Fringes

PIPEFITTER.......................$ 37.36            17.60
----------------------------------------------------------------
* ROOF0149-004 06/01/2009

BAY, GENESEE, LAPEER, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

ROOFER, Including Built Up,   
Composition and Single Ply   
Roofs............................$ 26.21            17.95
Slater...........................$ 27.71            17.95
----------------------------------------------------------------
 ROOF0149-006 05/01/2007

ST. CLAIR COUNTY:

                                   Rates          Fringes

ROOFER, Including Built Up,   
Composition and Single Ply   
Roofs............................$ 21.06            10.55
Slater...........................$ 23.06            10.55
----------------------------------------------------------------
* SFMI0669-001 01/01/2010

ALCONA, ALGER, ALLEGAN, ALPENA, ANTRIM, ARENAC, BARAGA, BARRY,
BAY, BENZIE, BERRIEN, BRANCH, CALHOUN, CASS, CHARLEVOIX,
CHEBOYGAN, CHIPPEWA, CLARE, CLINTON, CRAWFORD, DELTA,
DICKINSON, EATON, EMMET, GENESEE, GLADWIN, GOGEBIC, GRAND
TRAVERSE, GRATIOT, HILLSDALE, HOUGHTON, HURON, INGHAM, IONIA,
IOSCO, IRON, ISABELLA, JACKSON, KALAMAZOO, KALKASKA, KENT,
KEWEENAW, LAKE, LAPEER,  LEELANAU, LENAWEE, LIVINGSTON, LUCE,
MACKINAC, MACOMB, MANISTEE, MARQUETTE, MASON, MECOSTA,
MENOMINEE, MIDLAND, MISSAUKEE, MONTCALM, MONTMORENCY, MONROE,
MUSKEGON, NEWAYGO, OAKLAND, OCEANA, OGEMAW, ONTONAGON, OSCEOLA,
OSCODA, OTSEGO, OTTAWA, PRESQUE ISLE, ROSCOMMON, SAGINAW, ST.
CLARE, ST. JOSEPH, SANILAC, SCHOOLCRAFT, SHIAWASSEE, TUSCOLA,
VAN BUREN, WASHTENAW, WAYNE AND WEXFORD COUNTIES

                                   Rates          Fringes

SPRINKLER FITTER.................$ 31.46            15.85
----------------------------------------------------------------
 SHEE0007-008 06/01/2008

GENESEE AND LAPEER COUNTIES:

                                   Rates          Fringes

SHEET METAL WORKER...............$ 30.35            16.43
----------------------------------------------------------------
 SHEE0007-018 05/01/2008

BAY, SAGINAW AND TUSCOLA COUNTIES:

                                   Rates          Fringes

SHEET METAL WORKER...............$ 25.02            16.96
----------------------------------------------------------------
 SHEE0080-001 06/29/2009

ST. CLAIR COUNTY:

                                   Rates          Fringes

SHEET METAL WORKER...............$ 31.27            25.95
----------------------------------------------------------------
 TEAM0007-002 06/01/2002

BAY AND SAGINAW COUNTIES:

                                   Rates          Fringes

TRUCK DRIVER  
     Euclids, double bottoms 
     and  lowboys................$ 23.045         .50 + a
     Trucks under 8 cu. yds......$ 22.795         .50 + a
     Trucks, 8 cu. yds. and over.$ 22.895         .50 + a

FOOTNOTE:  a. $265.90 per week.
----------------------------------------------------------------
 TEAM0247-002 06/01/2008

ST. CLAIR AND TUSCOLA COUNTIES:

                                   Rates          Fringes

TRUCK DRIVER  
     Pole trailer driver, 
     lowboy driver, straddle 
     carrier, double bottom and 
     special load permit 
     driver, fuel truck driver, 
     bus driver and water truck 
     driver......................$ 24.195               a
     Truck driver on all trucks 
     except semi trucks or 
     tractor trailers, pole 
     trailers, lowboys, 
     straddle carriers, double 
     bottom, special load 
     permit vehicles and fuel 
     truck driver................$ 24.295               a
     Truck driver on semi 
     trucks or tractor 
     trailers, except pole 
     trailer driver, lowboy 
     driver, straddle carriers, 
     double bottom, special 
     load permit vehicles and 
     fuel     truck driver.......$ 24.445               a

  PAID HOLIDAYS: New Year's Day, Memorial Day, Independence
  Day, Labor Day, Thanksgiving Day and Christmas Day. If any
  of the above holidays fall on a Sunday, the following
  Monday shall be considered the holiday and, if work is
  performed, the rate shall be double time.

  FOOTNOTE:  a. $278.55 per week, plus $36.70 per day, plus the
  following vacation pay: Drivers who have been in the employ
  of their company for 3 years or less: $0.60 per hour.
  Drivers who have been in the employ of their company for 4
  through 10 years: $1.00 per hour. Drivers who have been in
  the employ of their company for 11 through 15 years: $1.45
  per hour. Drivers who have been in the employ of their
  company for 16 years and longer: $1.85 per hour.
----------------------------------------------------------------
 TEAM0247-009 06/01/2008

                                   Rates          Fringes

TRUCK DRIVER (Underground    
construction)  
     GENESEE AND ST. CLAIR 
     COUNTIES:
      GROUP 1....................$ 24.295278.55/wk+36.70/day
      GROUP 2....................$ 24.395278.55/wk+36.70/day
      GROUP 3....................$ 24.545278.55/wk+36.70/day
     LAPEER COUNTY:
      GROUP 1....................$ 24.195278.55/wk+36.70/day
      GROUP 2....................$ 24.295278.55/wk+36.70/day
      GROUP 3....................$ 24.445278.55/wk+36.70/day

  PAID HOLIDAYS: New Year's Day, Memorial Day, Fourth of July,
  Labor Day, Thanksgiving Day and Christmas Day.

  SCOPE OF WORK: Excavation, site preparation, land balancing,
  grading, sewers, utilities and improvements; also
  including, but not limited to, tunnels, underground piping,
  retention, oxidation, flocculation facilities, conduits,
  general excavation and steel sheeting for underground
  construction.  Underground construction work shall not
  include any structural modifications, alterations,
  additions and repairs to buildings or highway work,
  including roads, streets, bridge construction and parking
  lots or steel erection.

TRUCK DRIVER CLASSIFICATIONS    

  GROUP 1: Truck driver on all trucks (EXCEPT dump trucks of 8
  cubic yards capacity or over, pole trailers, semis, low
  boys, Euclid, double bottom and fuel trucks)

  GROUP 2: Truck driver on dump trucks of 8 cubic yards
  capacity or over, pole trailers, semis and fuel trucks

GROUP 3: Truck driver on low boy, Euclid and double bottom
----------------------------------------------------------------
 TEAM0332-002 06/01/2001

GENESEE AND LAPEER COUNTIES:

                                   Rates          Fringes

TRUCK DRIVER.....................$ 19.11  .22 + 252.70/wk

FOOTNOTE:   

  Paid Holidays: New Year's Day, Good Friday afternoon,
  Memorial Day, Fourth of July, Labor Day, Thanksgiving Day
  and Christmas Day, provided that the worker has 30 days or
  more of continuous employment with any one contractor, and
  that the worker works the last scheduled workday before the
  holiday and the first scheduled workday after the holiday.
----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).

----------------------------------------------------------------

In the listing above, the "SU" designation means that rates
listed under the identifier do not reflect collectively
bargained wage and fringe benefit rates.  Other designations
indicate unions whose rates have been determined to be
prevailing.

----------------------------------------------------------------

            WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can
be:

*  an existing published wage determination
*  a survey underlying a wage determination
*  a Wage and Hour Division letter setting forth a position on
   a wage determination matter
*  a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.

With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations.  Write to:

	Branch of Construction Wage Determinations
	Wage and Hour Division
	U.S. Department of Labor
	200 Constitution Avenue, N.W.
	Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

	Wage and Hour Administrator
	U.S. Department of Labor
	200 Constitution Avenue, N.W.
	Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board).  Write to:

	Administrative Review Board
	U.S. Department of Labor
	200 Constitution Avenue, N.W.
	Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

================================================================

   END OF GENERAL DECISION